work procedure:
1. Turn on the power terminal switch and the power indicator light starts to use it.
2. Pay attention to the fact that there are no obvious abnormal sounds from the internal and external machines. If there is a pause in operation and the operation must be stopped, please ask maintenance personnel to determine whether repairs are needed.
3. Carefully selected knives: Operated by designated personnel, the blade must be compared with the supporting tool by hand. The contrast of the knife must be correct. After the knife is completed, it must be tested manually. First, turn off the power terminal machine, press the button, and use a special wrench. Shake the driven pulley terminal machine to maximize the stamping stroke. If the hand does not move, then consider whether there is excessive pressure or other problems and check and debug it. Before locking the screws, check accordingly and confirm there is no need to loosen.
4. Pay attention to charging: it is necessary to hit the terminal device, use the Allen wrench to adjust the feeding plate, so that the terminal can pass through easily, whether the position of the visual material is sent appropriately, if not, adjust, use the Hex wrench to loosen the lock Tighten the screw feeder, dynamically adjust the rod diameter of the screw until the best, and then lock the machine to tighten the screw and start action.
5. Tensile testing machine: Well, when testing the waste wire, the tension test is as follows. The specific operation method of the "pull test bench" is as follows. The main reference value is to reset the zero key of the tension test to zero and the terminal wire test electric clamp. Test, if the measured tensile force is not within the standard range, ask maintenance personnel to adjust it until it reaches the standard value. 6. The 10 pieces produced will be sent to IPQC for first piece confirmation, which can be inspected and mass produced. During the production process, the terminal operator must check whether there are plastic bags, hanging and other defects, and a terminal pull test is performed every 1 hour.